XZR8®
Weichai BY612630110253 Turbocharger Assembly
Weichai BY612630110253 Turbocharger Assembly - Image 2
Weichai BY612630110253 Turbocharger Assembly - Image 3
Weichai BY612630110253 Turbocharger Assembly - Image 4
1 / 4

Weichai BY612630110253 Turbocharger Assembly


Express Free Shipping
3-Year Factory Warranty
90-Day Hassle-Free Returns
24/7 Dedicated Support
OEM Reference612630110253
Engine ApplicationWeichai WP10 / WP12 / WP13 Series
Turbo TypeWastegate / VGT (Application Specific)
Actuation MethodPneumatic / Electronic (Application Specific)
Compressor Inducer DiameterApprox. 60-70 mm (Typical for Class)
Turbine Exducer DiameterApprox. 70-80 mm (Typical for Class)
Lubrication MethodEngine Oil Fed, Full Floating Bearings
Cooling MethodOil Cooled / Water Cooled (Model Dependent)
Inlet Flange TypeV-Band / 4-Bolt (Model Dependent)
Outlet Flange TypeV-Band / 4-Bolt (Model Dependent)
Net Weight15.5 kg
Package Dimensions45 × 35 × 35 cm

Manufacturer No.

  • BY612630110253

OEM Part No.

  • 612630110253

Engine Part No.

  • Weichai WP10
  • Weichai WP12
  • Weichai WP13
  • Weichai WP10.5
  • Weichai WP12.5

Fitment Vehicles

  • Sinotruk Howo 371
  • Sinotruk Howo 420
  • Shacman F3000
  • Shacman X3000
  • FAW Jiefang J6P
  • FAW Jiefang J7
  • Shantui SD22 Dozer
  • Shantui SD32 Dozer
  • XCMG XE215 Excavator
  • XCMG XE225 Excavator
This turbocharger assembly is engineered to meet OEM specifications for Weichai Power WP10, WP12, and WP13 heavy-duty diesel engines. It utilizes a wastegate or variable geometry turbine configuration depending on specific engine calibration requirements. The unit comprises a compressor housing, turbine housing, and center housing rotating assembly (CHRA) with precision-balanced rotor group. It is designed for direct fitment on Sinotruk Howo, Shacman, and FAW Jiefang heavy-duty trucks as well as Shantui and XCMG construction equipment. The compressor wheel and turbine wheel are manufactured from high-temperature alloys to withstand sustained exhaust gas temperatures. The bearing system employs full-floating journal bearings and thrust bearing for reliable operation under high rotational speeds. Installation requires new gaskets, oil feed line inspection, and prime lubrication before engine start.